我的妈妈

Your current position: homepage > engineering cost > Local quota > >>

Qjg [2021] No. 2 labor unit price adjustment rar

Data evaluation:
☆☆☆☆☆
Update time:
2021-01-25
Download requirements:
Registered member
Document size:
772KB
Authorization method:
Sharing information
Upload member:
sunxun
Document type:
.rar
Column:
Local quota
Gold coin required:
two
Language:
Simplified Chinese
Notice: Free registration Members can get gold coins immediately. For more ways to earn gold coins, please check: Description of gold coin Download address
Brief introduction:
1. For the comprehensive quota of construction, installation, municipal administration, landscaping, prefabricated, utility tunnel, green building, protective airtight and other projects in Hainan Province issued after 2017, the unit price of construction workers quota is adjusted from the current 122.53 yuan / man day to 135 yuan / man day.
2. The "comprehensive quota of decoration engineering in Hainan Province" issued in 2015 is calculated by multiplying the fixed labor cost with a coefficient of 1.27.
?
Help center Collection > > >
Qjg [2021] No.2 labor unit price adjustment Download
 Click here to download

architectural engineering

Decoration

Road and bridge tunnel

structural engineering

Electric power

engineering cost

HVAC

Landscape

Water supply and drainage engineering

water conservancy project

Construction supervision

Geotechnical engineering

Registration examination

Material model

paper

我的妈妈_宝宝好涨水快流出来免费软件_荷兰victoryday高清

http://98.top1car.cn http://93.top1car.cn http://99.top1car.cn http://42.top1car.cn http://54.top1car.cn http://39.top1car.cn http://58.top1car.cn http://83.top1car.cn http://49.top1car.cn http://68.top1car.cn http://24.top1car.cn